The Assabet River Rail Trail is the newest paved trail in the area. Eventually, it will run for 12.5 miles from Marlborough to Acton, but only a little over 5 miles is currently rideable.
Assabet River Rail Trail
This entry was posted in Day in the Life. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.
One Comment
but those five miles are quite the five miles. it will be amazing when all is done. cannot wait for warmer weather :)